Job Number NB001:  Most of the Epoxy Runs within the inside of the hull have now been removed.
Job Number NB002:  The Hog (inner keel) is now installed on the building frame and the frames have been glued in position to it.
 
The remaining larch for both boats has now been delivered to the shed.  The Aprons and Stems for NB002 have been manufactured and are available to install.